top of page
GLOBALALLIANZ Group
Freight forwarders ;InLand Logistics,Gross average management;Fertilizers import & Clearance;Project cargoes Management;Procurement & Laytime control;Offshore Boats Temporary import & Clearance;On Shore & Offshore Operation
BEIRAMAR Shipping
Shipping Agency,Crew Change, Spare parts, Holds & Hull cleaning, Cargo & bunker Survey , On Shore & Off Shore labours teams, P&i
Aratu Port - COTEGIPE TERMINAL ( Soya , Wheat , Maize , Malt )
Pier Draft dwt dISPLACEMENT DISCHRATE W.D EQUIPMENTS
PIER I 13,50 M 75.358 88.450 3000mt p/day 1,025 01 SHORE UNLOADER + CONVEYOR BELT
Pier Draft dwt dISPLACEMENT LOADRATE W.D EQUIPMENTS
PIER II 11,50 M 75.358 88.450 SBM: 800 mt p/h 1,025 01 SHORE SHIPLOADER + CONVEYOR BELT
SBMP: 650 p/h
Important :
-
Berthing window: The terminal works based on Berthing Window of each Shipper which always dependable on cargo readiness.
​
-
Stowage factors(average): SBM: 48,5SBMP: 52,50 MAIZE: 47,50 - 48,50 - 49,00 SBM: 48,5SBMP: 52,50
Aracajù Port - TMIB TERMINAL - VLI -Barra dos Coqueiros ( Fertlizer , Soya B, Project )
Pier Draft dwT LOA dISPLACEMENT DISCHRATE W.D EQUIPMENTS
PIER I 9,50 M 60.000 200 m .Not Applic 3/40000mt p/day 1,025 01 SHORE UNLOADER + CONVEYOR BELT
Important :
-
INFRAESTRUCTURE TAX: Clientes transiting in Aracaju Port must address extra attention to the tariff of Infraestructure which is paid by Owner Dwt x usd 1,80
Pier Draft dwT LOA dISPLACEMENT DISCHRATE W.D EQUIPMENTS
PIER 3-4 11,50 m 50.000 200 m 60.000 3/40000mt p/day 1,025 Ship´s crane use
PIER 5-6-7-8 8,00 m 40.000 200 m 50.000 3/40000mt p/day 1,025 Ship´s crane use
TECONT 12,00 m 65.000 200 m 84.0000 3/40000mt p/day 1,025 Ship´s crane use
Pier Cais Carvão(Wheat) 12,00 m 65.000 200 m 84.0000 3/40000mt p/day 1,025 Ship´s crane use
Important :
-
Max draft x Floating pontoons: The max draft of the Piers is increased to 9,20 m when ship using Floating pontoons
bottom of page